Summary Tom builds a structural wall inbound of the brick foundation. Richard shows Kevin the result of two weeks of hand digging and rough plumbing. The radiant heat/insulation system is going in. Tom joins to get the first of two massive LVLs tucked into the pockets in the brick sidewalls. Tom shows Kevin how he's going to open up the back wall for the new bump out.
Directed : Unknown
Written : Unknown
Stars : Norm Abram Richard Trethewey Kevin O'Connor Tom Silva
Genres : Documentary Reality-TV
Release date : Oct 8, 2014
Filming locations : Acton, Massachusetts, USA
Summary Tom builds a structural wall inbound of the brick foundation. Richard shows Kevin the result of two weeks of hand digging and rough plumbing. The radiant heat/insulation system is going in. Tom joins to get the first of two massive LVLs tucked into the pockets in the brick sidewalls. Tom shows Kevin how he's going to open up the back wall for the new bump out.